Greenheart Key Personnel Federal Client Experience
¨ Fort Stewart ¨ Hunter Army Airfield ¨ MCLB Albany ¨ Naval Submarine Base Kings Bay ¨ Shaw AFB ¨ Robins Air Force Base ¨ Dobbins Air Reserve Base ¨ Fort Bragg ¨ Naval Air Station Jacksonville ¨ Eglin Air Force Base ¨ Patrick Air Force Base ¨ Fort Hood ¨ Veterans Administration (VA) ¨ Federal Aviation Administration ¨ USDA Southeastern Region ¨ General Services Administration |
Greenheart Federal Client Experience
¨ Hunter Army Airfield ¨ Robins Air Force Base ¨ Naval Submarine Base Kings Bay ¨ Naval Air Station Pensacola ¨ Naval Air Station Jacksonville ¨ Fort. Gordon ¨ Georgia Air National Guard ¨ Federal Aviation Association |
What our clients are saying..
"Greenheart Construction Inc. performed at an excellent level on the contract. Look forward on working with Greenheart Construction Inc on upcoming projects"
John.W-EOC "Greenheart Construction Inc. has performed satisfactorily and successfully on multiple projects. I have been very pleased with their professionalism and would highly recommend their service."
Johnny.B- JEB Construction " I wish to commend Greenheart Construction Inc. for the excellent work performed by your forces. The project was on time, on budget and free from punch list issues. We look forward to working with you in the future and please accept our thanks for a job well done"
Thomas. D - Portico Services |
Greenheart Past Performance
Repair & Replace South Fence Line Perimeter Lights, Naval Air Station Jacksonville, FL
Design Build Project: Demolish 15 existing non-functioning solar powered light fixtures, poles, solar panels, batteries, conduits and conductors .Furnish and install 49 new LED with photo cells fixtures, direct buried poles, transformer, panel, meter, underground conduit and conductors. Project is a high visibility project with unique constraints that is instrumental in maintaining base security and safety of base residents $574,285 |
Renovate Hallways-Bldg 20400, Fort Gordon GA.
Design Build Project: Remove existing VCT floor cover and Wall base. Install 3 components Epoxy Floor coating system. Project is located in a 24 hour secure mission support facility building $150,000 |
Repair Standby Electrical Facility 968, POL Aircraft Fueling Facility, Savannah GA.
Design Build Project: Upgrade and Reconfigure POL Electrical system for Facility 968, coordinate with Georgia Power incoming feed. $259,000 |
Install Solar Aerators at Waste Water Tank Farm
Kings Bay, GA Demolish existing mechanically driven aerators. Furnish and install new Solar Aerators at waste water tank form. $200,000 |
PROVIDE PORT OPERATIONS SMALL CRAFT FLOAT REPLACEMENT, Kings Bay, Georgia
Repair the small craft float at port operations to include guide collars along with complete repair by replacement of the steel floats needed to support the current critical operations. $2,942,760.00 |
Repair the expansion joint inside the pool, Pensacola FL
Facility 3734 was constructed in 1978 and is a concrete structure that encompasses approximately 5,562 SF. It is currently used as the “All Hands” pool at NAS, Corry Station. $76,253 |
Greenheart Staff Past Performance

Replace Chillers Main Tower, Department of Veterans Affairs, Atlanta, Georgia
This work included the demo of the existing chiller, the adding of concrete pads, moving of the chemical feeders, and the complete installation of two new chillers with the test and balancing of the units. $1,447,096.00
This work included the demo of the existing chiller, the adding of concrete pads, moving of the chemical feeders, and the complete installation of two new chillers with the test and balancing of the units. $1,447,096.00

Department of the Air Force; Repairs to Hangar C Doors, Cape Canaveral Air Force Station, Florida
This project involves extensive lead remediation, replacement of all door windows, steel panel replacement and repairs, and painting. Work also includes installation of new wicket doors, frames and thresholds. The total contract value for this project is $1,429,270.95
This project involves extensive lead remediation, replacement of all door windows, steel panel replacement and repairs, and painting. Work also includes installation of new wicket doors, frames and thresholds. The total contract value for this project is $1,429,270.95

Department of the Navy; Upgrade Substations 5, B-2200; Marine Corps Logistics Base, Albany, Georgia
This project consists of replacement of the existing high voltage substation and all feeder panels. Work included underground duct banks, and use of temporary generator power to avoid loss of production in this highly volatile Industrial complex. The total contract value for this project is $2,255,278.00 dollars.
This project consists of replacement of the existing high voltage substation and all feeder panels. Work included underground duct banks, and use of temporary generator power to avoid loss of production in this highly volatile Industrial complex. The total contract value for this project is $2,255,278.00 dollars.

Department of the Air Force; Repairs to Hangar C Doors, Cape Canaveral Air Force Station, Florida
This project involves extensive lead remediation, replacement of all door windows, steel panel replacement and repairs, and painting. Work also includes installation of new wicket doors, frames and thresholds. The total contract value for this project is $1,429,270.95
This project involves extensive lead remediation, replacement of all door windows, steel panel replacement and repairs, and painting. Work also includes installation of new wicket doors, frames and thresholds. The total contract value for this project is $1,429,270.95

Relocation of the Vascular Lab, Department of Veterans Affairs, Atlanta, Georgia.
A new second floor addition was constructed above an existing 2000 sq. ft. roof terrace. The scope of work included new structural steel framing, steel deck system and a new insulated built-up modified bitumen roofing system, new interior metal framed and drywall system to subdivide the area into office and a minor procedures examination room, ceramic tile, vinyl flooring, carpeting, suspended lay-in acoustical ceiling system, new door assemblies, new electrical devices, lighting, fire alarm and fire suppression system, plumbing and HVAC ductwork. $1,179,547.00
A new second floor addition was constructed above an existing 2000 sq. ft. roof terrace. The scope of work included new structural steel framing, steel deck system and a new insulated built-up modified bitumen roofing system, new interior metal framed and drywall system to subdivide the area into office and a minor procedures examination room, ceramic tile, vinyl flooring, carpeting, suspended lay-in acoustical ceiling system, new door assemblies, new electrical devices, lighting, fire alarm and fire suppression system, plumbing and HVAC ductwork. $1,179,547.00

Modernize Patient Ward Phase 2 Pedestrian Bridge, Department of Veterans Affairs, Atlanta, Georgia.
Construct a new pedestrian bridge system to include an elevator/stair tower, a covered walkway (bridge) system from the elevator tower to the existing canopy system for the Veterans Business Administration building on the north side of Southern Lane and a covered walkway system from the elevator/stair tower westward to the entrance for the ambulatory care area of the main hospital. $3,903,564.00
Construct a new pedestrian bridge system to include an elevator/stair tower, a covered walkway (bridge) system from the elevator tower to the existing canopy system for the Veterans Business Administration building on the north side of Southern Lane and a covered walkway system from the elevator/stair tower westward to the entrance for the ambulatory care area of the main hospital. $3,903,564.00